M

Audit (OFC)
Mendu Group
Hyderābād
Full-Time
0-3 Years experience
Description
Job Description: Audit (OFC) - KRA & KPI
Key Responsibility Areas (KRAs)
1. OFC Infrastructure Audit & Quality Assurance
- Audit fiber optic cable work execution across different deployment methodologies (aerial, underground, duct-based)
- Verify proper duct closure with end plugs after Horizontal Directional Drilling (HDD) shoot completion
- Inspect chamber installation quality and structural integrity
- Ensure earthing compliance at every 8 km of optical fiber distance as per standards
- Verify installation of simple plugs at duct entry points within chambers
- Check PCC (Plain Cement Concrete) work quality in chamber construction
- Audit cable looping procedures and verify proper execution
- Inspect fiber splicing quality in closures and ensure proper fiber routing in splice trays
- Conduct depth verification surveys to identify low-depth cable locations
- Verify protective measures for underground cables (warning tape, marker posts, protection slabs)
2. Route Verification & Field Issue Management
- Conduct physical route verification for existing (old) OFC routes
- Identify and document field-level issues, damages, and non-compliance
- Report findings to Operations team with detailed observations and photographic evidence
- Obtain committed timelines for rectification of identified issues
- Track and monitor rectification progress through weekly reviews until work closure
- Follow up on pending issues and escalate delays to appropriate authorities
3. Enterprise Customer Connectivity & Service Quality
- Audit fiber connectivity delivery for Enterprise customers
- Investigate repeated outage incidents on customer escalation routes
- Conduct root cause analysis for frequent service disruptions
- Review historical cases on a weekly basis to identify patterns and systemic issues
- Ensure timely resolution of enterprise customer connectivity issues
4. Aerial Cable Inspection & Risk Assessment
- Inspect aerial OFC routes for cable sagging issues during weekly reviews
- Identify potential physical damage risks from high-rise vehicle movements
- Assess clearance heights and compliance with safety standards
- Recommend preventive measures for vulnerable aerial sections
- Monitor seasonal and weather-related impacts on aerial infrastructure
5. Safety & Execution Compliance
- Verify adherence to safety protocols during OFC execution work
- Ensure proper barricading is installed during ongoing execution activities
- Check deployment and functionality of safety horns/warning systems at work sites
- Audit compliance with safety precautions during trenching, splicing, and restoration work
- Monitor use of Personal Protective Equipment (PPE) by field teams
- Ensure proper traffic management and public safety measures at work locations
6. Documentation, Reporting & MIS
- Prepare detailed audit reports with findings, observations, and recommendations
- Maintain audit checklists and compliance documentation
- Track audit outcomes and closure status through MIS dashboards
- Conduct weekly review meetings and prepare status reports
- Maintain photographic evidence and geo-tagged location data for audits
- Generate periodic trend analysis reports on recurring issues
Key Performance Indicators (KPIs)
Quality & Compliance KPIs
- Audit Coverage: Minimum 95% of planned route/sites audited monthly
- Compliance Rate: >90% adherence to OFC installation standards across audited sites
- First-Time Right (FTR): >85% of audited work meeting quality standards without rework
- Earthing Compliance: 100% compliance with earthing at 8 km intervals
- Depth Compliance: >90% of cable routes meeting minimum depth requirements (as per standards)
Issue Resolution KPIs
- Issue Identification Rate: Number of critical/major issues identified per audit cycle
- Closure Rate: >80% of identified issues resolved within committed timelines
- Average Resolution Time: Mean time for issue rectification (Target: <15 days for critical issues)
- Repeat Issue Rate: <10% recurrence of similar issues on same routes
Customer Impact KPIs
- Enterprise Outage Reduction: >30% reduction in repeated outages on escalated customer routes (quarter-on-quarter)
- Customer Complaint Closure: 100% audit of enterprise customer escalation cases within 48 hours
- Customer Impact Score: <5% of audited enterprise routes with unresolved connectivity issues
Safety & Risk Management KPIs
- Safety Compliance Score: >95% adherence to safety protocols (barricading, signage, PPE) during audits
- Aerial Sagging Incidents: <5% of audited aerial routes with critical sagging issues
- Risk Mitigation: 100% high-risk locations (vehicle damage zones) documented and escalated
Operational Efficiency KPIs
- Weekly Review Adherence: 100% completion of weekly review meetings with Operations team
- Audit Cycle Time: Average time per site audit (Target: <4 hours per major site)
- Report Turnaround Time: Audit reports submitted within 24 hours of site visit
- Documentation Completeness: >95% of audits with complete documentation (photos, GPS coordinates, measurements)
Trend Analysis & Continuous Improvement KPIs
- Old Case Review: 100% review of pending old cases on weekly basis
- Trend Identification: Monthly trend reports on recurring issues submitted on time
- Preventive Action: Number of preventive recommendations implemented (Target: >70% acceptance rate)
- Process Improvement: Quarterly suggestions for process/quality improvements
Competencies Required
- Strong understanding of OFC network architecture and installation methodologies
- Knowledge of fiber splicing, testing, and restoration techniques
- Ability to read and interpret technical drawings and route maps
- Proficiency in audit methodologies and quality control processes
- Strong analytical and problem-solving skills
- Excellent communication and stakeholder management abilities
- Attention to detail and systematic approach to inspections
About Mendu Group
Mendu Group is an Indian consulting firm providing business strategy and technology solutions for enterprises.
